Online Coaching
Real coaches. Your equipment. Your schedule. No generic templates.
Couldn't load pickup availability
Bells of Steel Training App
Bells of Steel Training App
Your equipment purchase unlocks 30 days free on the Bells of Steel Training App.
Pick your equipment setup in-app and get a coach-built strength program that matches — ZERO substitutions. Built from the ground up for what you own.
App Features:
• 30+ full programs + 20+ single-day workouts
• 1,000+ exercise demo videos with coaching cues
• Progress tracking: volume, intensity, PRs
• Works with Apple Health, Health Connect, Garmin, Fitbit
• Couples Plan available
• 30 day money-back guarantee
Product Details
Product Details
Specifications
Specifications
| Online Coaching Details | |
|---|---|
Coaches |
|
Commitment Options |
|
Platform |
|
Equipment Supported |
|
Session Frequency |
|
Form Review |
|
Communication |
|
Reporting |
|
Integrations |
|
Equipment Guidance |
|
App Subscription |
|
Shipping & Returns
Shipping & Returns
We get it — shipping heavy gym gear raises some important questions. Here’s exactly what to expect:
Flat-Rate Shipping: Most orders ship for much less, but no matter how big your setup gets, you’ll never pay over $199 CAD for shipping in Canada. Some conditions apply for rural or Northern addresses.
Shipping Time: Orders ship within 1–3 business days and usually arrive within 3–7 business days (during sales events, delivery may take up to 2 additional business days).
Fulfilled from our Calgary or Toronto warehouses. Local to either city? Pick up in-store and skip the shipping fees!
Returns: All Bells of Steel products are backed by our 30-day return policy. If you don’t love your order, send it back — simple and stress-free.
Warranty & Guarantees
Warranty & Guarantees
Product Features
-
Real Coach. Real Feedback. (Not a Template With Your Name On It)
Upload your lifting videos inside the app and get detailed form feedback — often via Loom — from Mo or Aleesha. Actual coaching cues. Actual program adjustments. Not a chatbot reply.
-
Custom Program Built for Your EXACT Equipment
Your program is built for what you own — not what a commercial gym assumes. Rack, All-In-One trainer, cable tower, kettlebells, DB + bench. No substitutions. No shoehorning.
-
Ongoing Adjustments — This Is NOT a One-Time PDF
Your program updates based on your performance, feedback, and how life is going. Loads get adjusted. Exercises get swapped. Progressions get tightened. Your coach is watching — and adapting.
-
Kickoff Strategy Call — Start Right
Start with a real call: align on your goals, equipment, schedule, injury history, and stress load. Then your coach builds a plan you'll actually follow — not one that looks good on paper and falls apart by Week 2.
-
Life-Aware Programming — Chaos Week Doesn't Derail You
We program around your real schedule, stress, sleep, and injury history. Travel week? New baby? Flare-up? Message your coach and your plan gets modified — not ignored.
-
Full Training App Included
Coaching includes full access to the Bells of Steel Training App: program delivery, tracking, 1,000+ demo videos, progress reports, and PR logging — all in one place. No separate subscriptions.
Product Details
You bought the equipment. Now let's make sure you're using it the right way.
Not 'substitute a dumbbell for the cable.' Not 'here's a 12-week template, good luck.' A real coach who knows your equipment, your schedule, and what your joints can actually handle.
That's what Bells of Steel Online Coaching is.
Most remote coaching falls into two buckets:
- Hardcore competitor prep — time-heavy, recovery-heavy, designed for people with two hours a day and nothing else to do.
- Generic 'remote coaching' that's basically a template with your name on it.
We don't do either.
You work 1-on-1 with Mo or Aleesha. Not an algorithm. Not a rotating roster. Your coach.
We start with a kickoff call: your goals, your equipment, your schedule, your injury history, and your stress load. Then we build a program that fits your life — not an idealised version of it.
Compounds first. Logical progressions. Rep ranges that match your goal. Conditioning when it supports the plan — not random fatigue. And when life gets messy? Your plan adapts instead of collapsing.
Ongoing adjustments, not a one-time PDF.
Who It's For
This is for the busy parent who can't afford to 'figure it out' for six months. For the comeback lifter whose joints don't tolerate ego training. For the home gym owner who wants a plan that fits real life — and actually progresses.
If you want to feel strong, move better, and not get hurt — without spending hours researching programs and guessing whether what you're doing is working — this is for you.
We'll tell you exactly what to do. And exactly why.
Coaches + Platform
You work with Mo Youssef (National Certificate in Strength & Conditioning, trained under Olympic champion Mohamed Ehab, specialises in adults 40+) or Aleesha Gettis (BKin, Registered Professional Kinesiologist, 4+ years coaching experience). Your assignment is based on goals, equipment, and coaching fit — not a spin of the wheel.
Coaching is delivered through the Bells of Steel Training App — professional coaching software used by thousands of certified coaches worldwide. That means elite-level tracking, progress reports, 1,000+ demo videos with cues, and in-app messaging. All in one place.
Coaching includes full Training App access. No separate subscription needed.
Start with a Starter Month — no commitment, full onboarding. It's front-loaded support: kickoff call, intake, custom program, first adjustments. Best if you want to hit the ground running without locking in.
3-Month is the sweet spot for real progress. 12-Month is best value — because consistency beats novelty every time.
Couples Coaching also available: two profiles, two custom programs, two sets of form reviews. One stronger household.
How Access Works
After purchase, your coach will be notified of your order and reach out to invite you to the app. In the app, you fill out the onboarding form, then have a kickoff call with your coach. They build your program and schedule a second call to walk through it and answer any questions.
Not sure if this is right for you? Fill out this form and one of our expert coaches will reach out within 1–2 business days to answer any questions — no pressure, no commission.
PRODUCT SPECS
| Online Coaching Details | |
|---|---|
Coaches |
|
Commitment Options |
|
Platform |
|
Equipment Supported |
|
Session Frequency |
|
Form Review |
|
Communication |
|
Reporting |
|
Integrations |
|
Equipment Guidance |
|
App Subscription |
|








